Andover Senior Center – Life Floor Installation

Project Description

Concrete Science installed 2,339 square feet of 3/8-inch Life Floor Slate safety surfacing at the Andover Senior Center aquatic facility as a subcontractor to Horizon Pools.

The installation was designed to improve traction, comfort, and accessibility throughout the pool deck while creating a durable and visually coordinated finished surface for seniors, staff, and aquatic facility users.

Problems Solved

  • Comprehensive shot-blast surface preparation to achieve the optimal profile and adhesion on hard-troweled concrete
  • Strategic cleaning and filling of all saw cuts to create a monolithic coating system without joints or seams
  • Precise multi-coat application to ensure a consistent, uniform finish across the entire facility floor
  • Installation of a durable epoxy system designed for high-traffic, hygiene-sensitive manufacturing environments

Project Highlights

Scope of Work

Our installation scope included:

  • Flooring layout and pattern coordination
  • Precision cutting and fitting around drains, fixtures, penetrations, and perimeter transitions
  • Manufacturer-approved adhesive application
  • Full installation of the Life Floor system
  • Tight seam fitting and finishing
  • Final inspection and quality-control review
  • Substrate preparation was completed prior to installation. Caulking was not included in Concrete Science’s scope.

System Benefits

Life Floor is specifically engineered for aquatic environments and provides:

  • Enhanced slip resistance in wet conditions
  • A cushioned surface for improved comfort
  • ADA-friendly accessibility
  • Reduced impact in the event of slips or falls
  • Durable performance in high-moisture environments
  • A clean, professional appearance

Project Execution

The work was completed in accordance with Life Floor manufacturer installation specifications and coordinated closely with Horizon Pools and the project team. Our crew maintained established schedule and quality requirements while ensuring the completed surface was clean, secure, and ready for the next phase of construction.

Final Result

The completed installation provides the Andover Senior Center with a safer, more comfortable, and visually appealing aquatic surface. The custom Ripple layout complements the facility while delivering the traction and durability required for long-term use in a wet environment.